STACK Quick Start Assemblies - Division 26, Electrical
    • Dark
      Light
    • PDF

    STACK Quick Start Assemblies - Division 26, Electrical

    • Dark
      Light
    • PDF

    Article Summary

    Overview
    STACK's Quick Start assembly for HVAC can be used for simpler mechanical jobs

    Table of Contents
    26 Electrical


    26 Electrical

    Conduit and Wire

    Summary: This assembly is designed for a Linear takeoff.

    Variables:

    • Hanger Spacing In Feet - Used to calculate the hanger items.

    Required Items:

    These items will be automatically added to your takeoff.

    • Electrical Labor - by the linear foot.

    Item Groups:

    These groups contain a selection of items to choose if needed.

    • Choose Conduit - A selection of conduit from 1/4" to 4" in size.
    • Choose Wire 1-4 - Four items group each containing its own wire item named 1-4, calculated in linear feet.
    • Choose Hangers - A selection of hangers to match conduit size calculated using linear footage from the takeoff and the hanger spacing variable.
    • Choose Couplings - A selection of couplings to match conduit size.

    More on Quick Start Assemblies
    02 Asphalt Quick Start Assemblies
    04 Masonry Quick Start Assemblies
    06 Wood, Plastics & Composites
    07 Roofing Quick Start Assemblies
    09 Finishes Quick Start Assemblies
    32 Landscaping Quick Start Assemblies


    Was this article helpful?