STACK Quick Start Assemblies - Division 22, Plumbing
- Print
- DarkLight
- PDF
STACK Quick Start Assemblies - Division 22, Plumbing
- Print
- DarkLight
- PDF
Article summary
Did you find this summary helpful?
Thank you for your feedback
Overview
STACK's Quick Start assembly for Plumbing can be used for piping above or below grade up to 18" in diameter.
Table of Contents
22 Plumbing
22 Plumbing
Piping
Summary: This assembly is designed for a Linear takeoff.
Variables:
- Hanger Spacing In Feet - If using hangers, enter the spacing in feet.
Required Items:
These items will be automatically added to your takeoff.
- Piping Labor - by the linear foot.
Item Groups:
These groups contain a selection of items to choose if needed.
- Choose Pipe - A selection of plumbing pipe from 1/4" to 18" diameter, in linear feet.
- Choose Hangers - A selection of hanger items from 1/4" to 3" calculated using the linear takeoff and hanger spacing variable.
- Choose Insulation - A selection of insulation items from 1/4" to 3" diameter, in linear feet.
- Excavation - Contains an item for excavation labor by the linear foot.
More on Quick Start Assemblies
02 Asphalt Quick Start Assemblies
04 Masonry Quick Start Assemblies
06 Wood, Plastics & Composites
07 Roofing Quick Start Assemblies
09 Finishes Quick Start Assemblies
32 Landscaping Quick Start Assemblies
Was this article helpful?