STACK Quick Start Assemblies - Division 2, Asphalt
    • Sombre
      Lumière
    • PDF

    STACK Quick Start Assemblies - Division 2, Asphalt

    • Sombre
      Lumière
    • PDF

    The content is currently unavailable in French. You are viewing the default English version.
    Résumé de l’article

    En Español

    Overview

    STACK currently offers one Quick Start Assembly for asphalt

    Table of contents

    02 Asphalt Paving


    02 Asphalt Paving

    Asphalt Paving - Area

    Summary: This assembly is designed for an Area takeoff

    Variables:

    • Depth Of Stone In Inches – this will be used to calculate aggregate base.
    • Depth Of Binding Course In Inches – this will be used to calculate the binding course item.
    • Depth Of Wearing Course In Inches – this will be used to calculate the wearing course item

    Required Items:

    These items will be automatically added to your takeoff.

    • Binder Course - calculated in tons.
    • Wearing Course – calculated in tons.
    • Aggregate Base – calculated in tons
    • Asphalt Paving Labor – in square feet

    Item Groups:

    There are no Item Groups in this assembly.


    More on Quick Start Assemblies

    04 Masonry Quick Start Assemblies
    06 Wood, Plastics & Composites
    07 Roofing Quick Start Assemblies
    09 Finishes Quick Start Assemblies
    32 Landscaping Quick Start Assemblies


    Cet article vous a-t-il été utile ?