STACK Quick Start Assemblies - Division 3, Concrete
    • Oscuro
      Ligero
    • PDF

    STACK Quick Start Assemblies - Division 3, Concrete

    • Oscuro
      Ligero
    • PDF

    The content is currently unavailable in Spanish. You are viewing the default English version.
    Resumen del artículo

    Overview

    STACK's Quick Start assemblies for concrete are designed to work for many different types of structures and rebar configurations.

    Table of Contents

    03 Concrete


    03 Concrete

    Concrete Flatwork - 2D

    Summary: This assembly is designed for a Volume 2D takeoff.

    Variables:

    • Aggregate Base Depth In Inches - used to calculate the Aggregate Base item.
    • Rebar Spacing Inches If Used - Required if choosing rebar for reinforcing.

    Required Items:

    These items will be automatically added to your takeoff.

    • Aggregate Base - calculated in tons, based on the area component of the takeoff and aggregate depth variable.
    • Concrete - cubic yards equal to the takeoff total.
    • Concrete Flatwork Labor - by the square foot.

    Item Groups:

    This group contains a selection of items to choose if needed.

    • Choose Reinforcing - either rebar or welded wire mesh.
    • Choose Vapor Barrier - by the roll based on square footage of the takeoff

    Concrete Footing, Beam, Curb - Linear

    Summary: This assembly is designed for a Linear takeoff. It can be used for different types of footings, beams and simple curbs.

    Variables:

    • Concrete Width In Inches - Used to calculate the volume of concrete and length of transverse rebar.
    • Concrete Depth In Inches - Used to calculate the volume of concrete.
    • Continuous Rebar Count - the number of bars running along the length of the concrete.
    • Transverse Rebar Spacing In Inches - Required if choosing a transverse rebar item.
    • Vertical Rebar Spacing In Inches - Required if choosing a vertical rebar item.
    • Vertical Rebar Length In Feet - If choosing vertical rebar this is the total length of each piece including bends and hooks.

    Required Items:

    These items will be automatically added to your takeoff.

    • Concrete - Cubic yards calculated using the linear takeoff total plus depth and width variables.
    • Concrete Footing Labor - by the linear foot.

    Item Groups:

    This group contains a selection of items to choose if needed.

    • Continuous Rebar - by the linear foot, based on the linear takeoff total and rebar count variable.
    • Transverse Rebar - by the linear foot, based on the linear takeoff total, width variable and transverse spacing variable.
    • Vertical Rebar - by the linear foot, based on the linear takeoff total, width spacing variable and vertical rebar length variable.
    • Excavation Labor - by the linear foot.

    Concrete Rectangular Column/Pier - Count

    Summary: This assembly is designed for a Count takeoff. It may work for any vertical rectangular concrete structure.

    Variables:

    • Column Height In Feet - Or depth if you have a pier. The vertical dimension. It is used to calculate concrete and all rebar.
    • Column Width In Inches - One of the horizontal dimensions, used to calculate concrete and cage rebar.
    • Column Length In Inches - One of the horizontal dimensions, used to calculate concrete and cage rebar.
    • Vertical Rebar Count - Used to calculate vertical rebar.
    • Rebar Cage Spacing In Inches - Used to calculate cage rebar.

    Required Items:

    These items will be automatically added to your takeoff.

    • Concrete - Cubic yards calculated using the count takeoff total plus width, length and height variables.
    • Concrete Column/Pier Labor - per each.
    • Rebar (Vertical) - in linear feet, based on the takeoff count, column height and rebar count.
    • Rebar (Cage) - in linear feet, based on the takeoff count, column dimensions and spacing variable.

    Item Groups:

    This group contains a selection of items to choose if needed.

    • Excavation - per each.

    Concrete Round Column/Pier - Count

    Summary: This assembly is designed for a Count takeoff. It may work for any vertical round concrete structure.

    Variables:

    • Column Diameter In Inches - used to calculate concrete and cage rebar
    • Column Height In Feet - used to calculate concrete and all rebar
    • Vertical Rebar Count - used to calculate vertical rebar
    • Rebar Cage Spacing In Inches - used to calculate cage rebar

    Required Items:

    These items will be automatically added to your takeoff.

    • Concrete - Cubic yards calculated using the count takeoff total plus diameter and height variables.
    • Concrete Column/Pier Labor - per each.
    • Rebar (Vertical) - in linear feet, based on the takeoff count, column height and rebar count.
    • Rebar (Cage) - in linear feet, based on the takeoff count, column dimensions and spacing variable.

    Item Groups:

    This group contains a selection of items to choose if needed.

    • Excavation - per each.

    More on Quick Start Assemblies

    02 Asphalt Quick Start Assemblies
    04 Masonry Quick Start Assemblies
    06 Wood, Plastics & Composites
    07 Roofing Quick Start Assemblies
    09 Finishes Quick Start Assemblies
    32 Landscaping Quick Start Assemblies


    ¿Te ha sido útil este artículo?