Overview
STACK's Quick Start assembly for Plumbing can be used for piping above or below grade up to 18" in diameter.
Table of Contents
22 Plumbing
22 Plumbing
Piping
Summary: This assembly is designed for a Linear takeoff.
Variables:
- Hanger Spacing In Feet - If using hangers, enter the spacing in feet.
Required Items:
These items will be automatically added to your takeoff.
- Piping Labor - by the linear foot.
Item Groups:
These groups contain a selection of items to choose if needed.
- Choose Pipe - A selection of plumbing pipe from 1/4" to 18" diameter, in linear feet.
- Choose Hangers - A selection of hanger items from 1/4" to 3" calculated using the linear takeoff and hanger spacing variable.
- Choose Insulation - A selection of insulation items from 1/4" to 3" diameter, in linear feet.
- Excavation - Contains an item for excavation labor by the linear foot.
More on Quick Start Assemblies
02 Asphalt Quick Start Assemblies
04 Masonry Quick Start Assemblies
06 Wood, Plastics & Composites
07 Roofing Quick Start Assemblies
09 Finishes Quick Start Assemblies
32 Landscaping Quick Start Assemblies
¿Te ha sido útil este artículo?