STACK Quick Start Assemblies - Division 22, Plumbing
    • Oscuro
      Ligero
    • PDF

    STACK Quick Start Assemblies - Division 22, Plumbing

    • Oscuro
      Ligero
    • PDF

    The content is currently unavailable in Spanish. You are viewing the default English version.
    Resumen del artículo

    Overview

    STACK's Quick Start assembly for Plumbing can be used for piping above or below grade up to 18" in diameter.

    Table of Contents

    22 Plumbing


    22 Plumbing

    Piping

    Summary: This assembly is designed for a Linear takeoff.

    Variables:

    • Hanger Spacing In Feet - If using hangers, enter the spacing in feet.

    Required Items:

    These items will be automatically added to your takeoff.

    • Piping Labor - by the linear foot.

    Item Groups:

    These groups contain a selection of items to choose if needed.

    • Choose Pipe - A selection of plumbing pipe from 1/4" to 18" diameter, in linear feet.
    • Choose Hangers - A selection of hanger items from 1/4" to 3" calculated using the linear takeoff and hanger spacing variable.
    • Choose Insulation - A selection of insulation items from 1/4" to 3" diameter, in linear feet.
    • Excavation - Contains an item for excavation labor by the linear foot.

    More on Quick Start Assemblies

    02 Asphalt Quick Start Assemblies
    04 Masonry Quick Start Assemblies
    06 Wood, Plastics & Composites
    07 Roofing Quick Start Assemblies
    09 Finishes Quick Start Assemblies
    32 Landscaping Quick Start Assemblies


    ¿Te ha sido útil este artículo?